Service capacity
Panel headroom
Check whether a Level 2 charger, heat pump, or other new load appears to fit a 100, 150, or 200 amp service — using measured utility demand or a simplified optional-method estimate.
Open the calculatorIndependent calculators for U.S. homeowners
Panel Headroom is a tool site, not a utility and not a contractor. Use the calculators to walk through headroom and operating cost with published methods and dated public data, then take the result to a licensed electrician or HVAC contractor.
Service capacity
Check whether a Level 2 charger, heat pump, or other new load appears to fit a 100, 150, or 200 amp service — using measured utility demand or a simplified optional-method estimate.
Open the calculatorBackup power
Add running watts for the loads that may run at once, then add only the largest starting increment. Default wattages come from Honda’s published estimation table.
Open the calculatorOperating cost
Compare dollars per million Btu of delivered heat using AFUE, HSPF2, and EIA 2025 state-average electricity and gas prices — or type the rates on your bill.
Open the calculatorThe overviews explain the decision. The question pages answer the way homeowners actually ask — 100-amp vs 200-amp, charger plus dryer, interlock vs transfer switch, heat-pump cost in a high-rate state.
Headroom, 40- vs 50-amp circuits, load management, and what a 200-amp upgrade actually includes.
Interlock kits, manual and automatic transfer switches, inlet size, and essential-load generator sizing.
HSPF2 vs AFUE, cold-climate COP at 5°F, mini-split vs window unit, and state-average running cost.
See all first-edition questions (53 published, with a larger inventory behind them).
This is not a permit calculation, a utility approval, or a substitute for a licensed electrician, HVAC contractor, or the authority having jurisdiction. Panel Headroom is an independent educational site. It is not a utility, a certification body, or a contractor. Electrical and generator work that is done incorrectly can cause fire, shock, or carbon monoxide poisoning. Use the adopted electrical code and manufacturer instructions; pull permits where required.